The process
Built around your space. Designed around your needs.
-
01
Initial consultation
The process starts with a call or email to discuss the project and schedule a meeting, and most projects begin with an in-home consultation. If you already have plans from a designer, architect or builder, send them ahead of time so we have a starting point. We talk through the scope, wood species, crown and trim details, door and drawer profiles, storage needs and any specific features you want. I also take measurements and talk through your timeline, because setting realistic expectations early keeps design, building and installation coordinated.
-
02
Design and planning
If you do not already have a plan, I explore multiple layouts with functionality in mind: how the space will be used, what may be behind the walls, construction limitations, clearances and traffic flow. The design fee covers the time to measure, develop layouts, create renderings, work through revisions and produce the drawings that move the project forward. If cabinets are purchased through Built Right LLC, that fee is credited back as part of moving forward with the cabinetry package.
-
03
Layouts, renderings and revisions
I begin by drawing the existing space on the computer and work through multiple layouts, then present a couple of the strongest designs and explain the tradeoffs between appearance, functionality and your specific needs. This is where you see the first renderings of your new space. From there we make revisions together, such as more drawers, pull-outs, custom inserts or a different configuration, and an updated revision is sent for review until we are confident in the layout and details.
-
04
Final design and sign-off
Once we are close, I finalize the drawings and create a PDF showing the approved layouts and project details. We review the project one final time and formally sign off on the cabinet layout, door and drawer profiles, wood species, colors and other selections. A physical sample door can be provided in the selected profile and finish, so you can see the actual combination before production. The sign-off gives the homeowner, builder, trades, cabinet builder and installer the same information before materials are ordered and construction begins.
-
05
Final field verification
The final drawings are also used to verify dimensions one more time. I double-check the measurements and think beyond whether the cabinet fits its final location: can it fit through the doorway, make the turn in a hallway, be moved safely into the space? Good cabinet design has to work on paper, in the finished room and during real-world delivery and installation.
-
06
Drawings for other trades
Once the drawings are final, I provide a PDF that the other contractors on the project can use. It gives plumbers, electricians, builders and other trades a clear reference for where fixtures, outlets, appliances and plumbing sit in relation to the cabinetry. Getting everyone working from the same plan helps prevent surprises and costly changes later in the project.
-
07
Cabinet production
At this point the building process begins. The cabinet builder has been scheduled, materials are ordered, and the approved wood species, finish and design details are ready for production. Depending on size and complexity, the cabinet build takes approximately one week to one month from start to finish, and we coordinate expectations before production begins.
-
08
Delivery and installation
When the cabinets are complete, each one is carefully wrapped and protected for delivery to the jobsite. Installation can be handled by your own carpenters, the ones you have already hired, or by the Built Right LLC team. Some final details, such as decorative hardware, can be selected or confirmed once the cabinets are installed if that makes the decision easier.

The punch list
Every design is checked against a 55-item finalization punch list before anything is built. Here are the eight categories, with a few of the items in each.
General info
4 items- Date / revision number
Layout and dimensions
9 items- Wall measurements verified on site
- Ceiling height confirmed
Functionality and flow
9 items- Work triangle spacing verified
- Trash pull-out located logically near sink or prep area
Appliance coordination
6 items- Refrigerator panel/door overlay confirmed
- Range hood and venting verified
Clearances and interferences
7 items- Dishwasher door fully opens without obstruction
- Check that fridge doors and handles clear adjacent walls or cabinets
Filler and scribe
5 items- Wall fillers accounted for (window, corners, returns)
Materials and finishes
7 items- Door style approved
- Sheen level confirmed
Install readiness
8 items- Obstructions noted (vents, outlets, beams)
- Delivery and install path confirmed
Warranty
Built Right LLC warrants cabinetry against defects in materials and workmanship for one (1) year from delivery or installation by Built Right LLC. Excludes misuse, moisture, and natural wood movement. Hardware covered by manufacturer warranty.